IAB Interactive Standardized Equipment List   return to main tree

Search Interactive SEL:





Last Updated: 6/23/2022 5:31:05 PM

Previous SEL Number: 08D2-03-SHWR

Description: Framework designed to deliver water/decontamination solution at low pressure, low volume.

ImportantFeatures: Stand alone.
Collapsible.
Rigged.
Quick setup.


Operating Considerations: Size.
Weight.
Runoff control / waste water management.
Water supply (source required).
Deployment time.


Training Requirements: Core Training: NFPA 470 Chapter 6 or Chapter 8.
Initial Training: Minimal (<1 day)
Sustainment Training: Minimal (<1 day)


Mandatory Standards:

Applicable Standards and References:


MSSL:
  • Responder Safety: Infectious Diseases
  • HazMat: Response Team
  • Mass Care / Shelter
  • REL: Full Canadian Recommended Equipment List
  • REL: LOS-1, Multi-Agency Intervention
  • REL: LOS-2, Scout/Reconnaissance Mission